PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Excavation for the underground sanitary sewer Facing South (800x600).jpg Lifting the slip forms at Elev. 4 (4th Floor) Facing South-West (800x600).jpg Constructing the shear wall panels for Elev. 4-Stairs -2 Facing South (800x600).jpg Continued installing underground sanitary sewer Facing south East (800x600).jpg Continued saw cutting Rahway Ave. under the bridge (800x600).jpg
Next page Excavation for the underground sanitary sewer Facing South (800x600)
Excavation for the underground sanitary sewer Facing South (800x600)